ROCHESTER CARBURETORS

Bulletin 9D-8 August, 1951

Bulletin 9D-8 August, 1951 Model "BC" Page 12
ROCHESTER PRODUCTS, DIVISION OF GENERAL MOTORS. ROCHESTER, NEW YORK
BOWL ASSEMBLY
1.   Drop small aluminum ball into pump well hole, and replace pump return spring. Press spring with finger to center it in pump well.
2.   Install large steel ball in pump discharge cavity. Place spring and spring guide atop ball. Spread spring guide slot slightly with screwdriver blade to keep in place.
3.   Press pump filter screen carefully into position.
4.   Install pump plunger assembly and attach pump link to pump plunger arm and throttle lever. Attach pin springs to each end of pump link.
NOTE: The dog leg in the pump link must face away from throttle shaft.
AIR HORN ASSEMBLY
1.   Install float needle seat and gasket, using screwdriver with 1/2" bit.
2.   Place power piston spring and power pis­ton into vacuum cavity. Piston should ride free in cavity.
3.   Place new gasket atop air horn, check to be sure that all air horn and gasket holes are aligned.
4.   Attach main well support to air horn securely.
5.   Install main metering jet in main well support.
6.   Assemble float needle to float and place float carefully into position. Tang at rear of float must face cover. Install float hinge pin as shown in Figure 9.
tmp417-1.jpg
Figure 9. Air Horn Assembly
NOTE: The float adjustment may be made at this point. For correct settings see the carburetor adjustment bulletin.

<PREVIOUS PAGE     NEXT PAGE>

 

RC INDEX

 

More Old Online Chevy Manuals & Info

 

WebCounter says that you are visitor number: 

Please Report any Broken Links or Pages that do not load properly.  Webmaster

This Information is for Research and the Promotion of the Preservation of Older Chevys

All Names, Trademarks and Logos Belong to their Respective Owners.

 Nedstat Basic - Free web site statistics

Web Space Provided by TOCMP