1954 Chevrolet Truck Shop Manual

    Page     Page  
     Fuel Pump 6-19   Oil Seal - Rear Bearing Upper - Replace 6-27  
     Air Cleaner 6-19   Crankshaft 6-27  
     Carburetor 6-19   Main Bearings - Install and/or Adjust 6-27  
     Manifold Heat Valve 6-19   Timing Gear Oil Nozzle 6-30  
     Valve Adjustment 6-19   Cylinder Block Front End Plate 6-30  
     Idling Adjustment 6-19   Crankshaft Gear - Install 6-30  
     Cooling System 6-20   Camshaft. Camshaft Gear and/or Thrust    
     Current and Voltage Regulator 6-20            Plate - Install 6-30  
     Road Test 6-20   Timing Gear Cover 6-32  
  Major Service Operations 6-20   Harmonic Balancer - Install 6-32  
     Engine 6-20   Clutch Housing - Install 6-32  
        Removal 6-20      Alignment Correction 6-33  
        Disassembly 6-21   Flywheel - Install 6-33  
        Cleaning and Inspection 6-23   Connecting Rod Alignment 6-34  
     Repairs 6-24      Assembly - Connecting Rod to Piston 6-34  
        Cylinder Conditioning 6-24   Connecting Rod and Piston - Assembly to    
        Cylinder Boring 6-24            Engine 6-36  
        Cylinder Honing and Piston Fitting 6-24   Oil Pump Assembly 6-38  
        Piston Pin Fitting 6-25   Cylinder Head 6-38  
     Camshaft 6-26   Rocker Shaft Oil Line Pipe 6-38  
     Camshaft Bearings 6-26   Engine Assembly 6-38  
        Removal 6-26   Engine Installation 6-39  
        Replacement 6-27        
        Reaming 6-27        

< PREVIOUS PAGE          CONTENTS          NEXT PAGE >

 

More Old Online Chevy Info

  

WebCounter says that you are visitor number:

to the Old Online Chevy Manuals

Please Report any Broken Links or Pages that do not load properly.  Webmaster

This Information is for Research and the Promotion of the Preservation of Older Chevys

All Names, Trademarks and Logos Belong to their Respective Owners.

   

Web Space Provided by TOCMP