1955 Chevrolet Passenger Car Shop Manual

    Page     Page  
  Six Cylinder Model Carburetor 6m-2            Test Before Installation 6m-22  
     General Description 6m-2            Installation 6m-22  
     Operation 6m-2   Eight Cylinder Model Carburetor    
     Care, Maintenance and Adjustments 6m-4      Carter WCFB (Four Barrel) 6m-23  
        Idle Speed Adjustment 6m-4      General Description and Operation 6m-23  
        Idle Mixture Adjustment 6m-4      Care, Maintenance and Adjustments 6m-25  
        Automatic Choke Adjustment 6m-4         Float Adjustments 6m-25  
        Float Level Adjustment 6m-6         Pump Adjustments 6m-25  
        Choke Overhaul 6m-7         Metering Rod Adjustments 6m-25  
        Throttle Rod Adjustment 6m-8         Vapor Vent Adjustment 6m-25  
     Major Service Operations 6m-9         Fast Idle Cam Clearance Adjustment 6m-25  
        Removal 6m-9         Unloader Adjustment 6m-25  
        Disassembly 6m-9         Lockout Adjustment 6m-25  
        Inspection 6m-10         Fast Idle Adjustment 6m-25  
        Assembly 6m-11         Idle Mixture Adjustment 6m-25  
        Installation 6m-11      Major Service Operations 6m-25  
  Eight Cylinder Model Carburetor           Disassembly 6m-25  
     Rochester 2GC (Two Barrel) 6m-12            Air Horn 6m-25  
     General Description 6m-12            Carburetor Body 6m-26  
     Operation 6m-12            Throttle Flange 6m-26  
     Care, Maintenance and Adjustments 6m-15         Cleaning and Inspection 6m-26  
        Preliminary Checks 6m-15         Assembly 6m-26  
        Idle Speed and Mixture Adjustment 6m-15            Throttle Flange 6m-26  
        Throttle Linkage Adjustment 6m-16            Carburetor Body 6m-27  
        Float Level and Drop Adjustment 6m-17            Air Horn 6m-27  
        Accelerator Pump Lever Adjustment 6m-17   Fuel Pump 6m-29  
        Automatic Choke Adjustment 6m-17      General Description 6m-29  
        Fast idle Adjustment 6m-18      Care, Maintenance and Adjustments 6m-30  
        Unloader Adjustment 6m-18         Fuel Pump Inspection and Test 6m-30  
     Major Service Operations 6m-18      Major Service Operations 6m-30  
        Removal 6m-18         Removal 6m-30  
        Disassembly 6m-18         Disassembly 6m-30  
           Choke 6m-18         Cleaning and Inspection 6m-31  
           Bowl Cover 6m-19         Assembly 6m-31  
           Bowl and Throttle Body 6m-19         Installation 6m-32  
        Cleaning and Inspection 6m-20   Air Cleaner 6m-32  
        Assembly 6m-21      Service Operations 6m-32  
           Throttle Body 6m-21         Standard Cleaner 6m-32  
           Bowl 6m-21         Oil Bath Air Cleaner 6m-32  
           Bowl Cover 6m-21   Troubles and Remedies 6m-33  
           Choke 6m-21   Specifications 6m-34  
        Special Tools

6m-34

 
             
             
             
             
             

< PREVIOUS PAGE          CONTENTS          NEXT PAGE >

 

More Old Online Chevy Info

  

WebCounter says that you are visitor number:

to the Old Online Chevy Manuals

Please Report any Broken Links or Pages that do not load properly.  Webmaster

This Information is for Research and the Promotion of the Preservation of Older Chevys

All Names, Trademarks and Logos Belong to their Respective Owners.

   

Web Space Provided by TOCMP