1955 Chevrolet Passenger Car Shop Manual

   

Page

    Page  
  Operation of Power Brakes 5-17   Major Service Operations 5-21  
     Released Position 5-18      Disassembly 5-21  
     Brake Application 5-19      Cleaning 5-23  
     Holding Position 5-19      Inspection 5-23  
     Fully Applied Position 5-19         Vacuum Cylinder Shell 5-24  
     Releasing 5-19         Hydraulic Cylinder Casting 5-24  
     No Power Condition 5-20         Hydraulic Port Fitting 5-24  
  Care, Maintenance and Adjustments 5-20         Compensating Port Fitting 5-24  
     Removal 5-20         Vacuum Supply Tube 5-24  
     Replacement 5-20         Piston Plates 5-24  
     Inspection 5-20         Hydraulic Plunger and Washer Assembly 5-24  
     Lubrication 5-20         Push Rod and Plunger Assembly 5-24  
     System tests 5-20         Vacuum Cylinder End Plate 5-24  
     Bleeding Instructions 5-21   Assembly 5-24  
     Air Cleaner Service 5-21   Brake Trouble Diagnosis 5-26  

< PREVIOUS PAGE          CONTENTS          NEXT PAGE >

 

More Old Online Chevy Info

  

WebCounter says that you are visitor number:

to the Old Online Chevy Manuals

Please Report any Broken Links or Pages that do not load properly.  Webmaster

This Information is for Research and the Promotion of the Preservation of Older Chevys

All Names, Trademarks and Logos Belong to their Respective Owners.

   

Web Space Provided by TOCMP